TwinWorks
Untitled product – preview

Untitled product

Elizabeth · Updated 20 Nov 2026

Open

  • Procedures3shared publicly
  • Views6all time
  • Rating–No ratings yet
  • Likes0from the Community

0 comments

Procedures

Untitled procedure

Usage · 1 step · No ratings yet

1 step
  1. New step

    Stage 1 Copper/Zinc Separator: Mount the 45-degree weight-relief baffle inside the bulk coin hopper and align the 1.55mm sizing gate at the 40-degree carrier disc exit. Place the 5-gallon zinc reject bucket on the right side under the 90-degree chute and leave the cantilevered front overhang open for Stage 2.

Stage 2 Electronic Checkweigher

Quality Control · 2 steps · No ratings yet

2 steps
  1. New step

    Stage 2 Electronic Checkweigher: Verify the 15mm outer guard collar and clear acrylic top lid sit evenly over the 180mm 16-pocket carrier wheel. Rest the right-hand orange reject ramp on the horizontal cross bar across the 5-gallon bucket rim and align the left accept ramp toward Stage 3.
  2. New step

    Stage 2 Electronic Checkweigher: Verify the 15mm outer guard collar and clear acrylic top lid sit evenly over the 180mm 16-pocket carrier wheel. Rest the right-hand orange reject ramp on the horizontal cross bar across the 5-gallon bucket rim and align the left accept ramp toward Stage 3.

Related products