Assemble the Stage 3 Hydraulic Coining Press

Assembly · 16 steps · No ratings yet

16 steps
  1. Position the preassembled industrial hydraulic press unit

    Safety prerequisite for all phases: Before assembly, follow the manufacturer’s instructions. Isolate electrical, hydraulic, and pneumatic energy, relieve stored pressure, and secure the platen against unintended movement.

    Place the H-frame hydraulic press level on the shop floor. Keep the skid base, guided upper platen, bolster plate, rear hydraulic power pack, and front control enclosure with dual-hand safety palm buttons and red emergency stop together as a preassembled unit.

  2. Bolt on the front receiver shelf bracket

    Fasten the heavy steel L-shelf bracket with raised retaining side lips to the front press frame below the discharge zone.

  3. Mount the precision-ground tooling subplate

    Place the precision-ground steel tooling subplate flat on the press bolster plate and secure it with four hex-head bolts.

  4. Install the upper die holder and upper coining die

    Bolt the cylindrical upper die holder to the underside of the guided platen. Seat the engraved upper coining die, sized for 19.05 mm US pennies, with the engraving facing downward.

  5. Mount the lower die block and recessed coining anvil

    Bolt the ground steel lower die block centrally onto the tooling subplate, directly beneath the upper die, with the recessed lower coining anvil flush with the top of the block.

  6. Fasten the integrated magazine support bracket

    Bolt the single-piece L-bracket with welded top collar lug onto the infeed side of the tooling subplate.

  7. Install the feed-tube collar and clear polycarbonate penny feed tube

    Seat the aluminum collar inside the support lug. Insert the 20.5 mm bore clear polycarbonate feed tube directly above the shuttle loading pocket, with the flared inlet funnel at the top to receive coins from Machine 2.

  8. Mount the one-piece machined T-slot shuttle guide track

    Bolt the single-piece slotted steel guide track flat onto the shuttle bed between the feed tube and the lower coining anvil.

  9. Slide the open-fork coin shuttle into the guide track

    Insert the open-fork coin shuttle, sized for 19.05 mm × 1.52 mm pennies, into the T-slot track. With energy isolated, check that the shuttle glides smoothly without binding.

  10. Bolt on the pneumatic cylinder mounting bracket and preassembled air cylinder

    Fasten the heavy L-shaped mounting bracket to the tooling subplate parallel to the shuttle track. Mount the preassembled pneumatic air cylinder on the bracket.

  11. Connect the single-piece shuttle drive arm and threaded clevis

    Bolt the one-piece steel drive arm to the rear of the open-fork shuttle. Couple the drive arm directly to the cylinder piston rod via the threaded clevis joint.

  12. Install the air-jet pillar and pneumatic ejection nozzle

    Bolt the vertical air-jet post beside the die station. Aim the directed air nozzle across the lower anvil toward the discharge chute.

  13. Bolt on the discharge chute support saddle

    Fasten the support saddle onto the discharge edge of the tooling subplate, aligned with the air-jet ejection path.

  14. Mount the one-piece enclosed stainless steel discharge chute

    Bolt the single-piece formed stainless steel U-channel chute onto the support saddle. The chute has 1.5 in high walls, a curved anti-bounce deflector roof, a clear top inspection window, and a short downward funnel spout.

    Clearance to verify before release: The spout must terminate 1.5 in vertically above the installed receiver magazine. Verify the actual gap in step 16 after the magazine is seated; do not assume it from the chute position or wall height.

  15. Place the cylindrical stack receiver base cup

    Seat the cylindrical stack receiver base cup inside the front receiver shelf bracket directly beneath the chute funnel spout.

  16. Insert the clear polycarbonate coin-stacking magazine tube

    Seat the removable 20.5 mm bore clear polycarbonate stacking tube in the receiver base cup.

    Verify before release: With the tube fully seated, measure the vertical gap from the bottom of the chute spout to the top of the installed receiver magazine. Verify the specified 1.5 in clearance from step 14 so the full magazine can be removed without snagging. Do not release the assembly until this clearance is verified.