TwinWorks
Stage 2 Penny Scale – 3D model preview

Stage 2 Penny Scale

Elizabeth · 3D model · Updated 23 Nov 2026

Open in 3D

  • Procedures1shared publicly
  • Views0all time
  • Rating–No ratings yet
  • Likes0from the Community

0 comments

Procedures

Assemble the Stage 2 Penny Scale

Assembly · 24 steps · No ratings yet

Warning: Frame collapse hazard: Do not install the split cotter pins or load the frame until engineering verifies their suitability as load-bearing leg locks.

24 steps
  1. Position the four floor pads

    Position the four 3 × 3 in steel floor pads at the infeed-console, opposite-infeed, discharge-console, and opposite-discharge corners, with socket collars up.

  2. Insert the lower inner legs

    Insert the four 1.00 in perforated lower inner legs into the floor-pad socket collars with the adjustment holes at the top.

  3. Fit the watershed upper sleeves

    Lower the four 1.25 in upper outer sleeves, with welded top flanges and corner gussets, over the lower inner legs so water sheds downward from the larger sleeve to the smaller leg.

  4. Verify the leg locks before setting frame height

    Stop: Do not install the specified 1/4 × 2.0 in stainless split cotter pins or load the frame until engineering has verified that the pins are suitable as load-bearing leg locks. Do not assume they are load-rated.

    Only after engineering verification, insert all four pins horizontally through the aligned cross-holes to set the underside of the frame rim at 6.5 in.

  5. Bolt on the long rim rails

    Bolt the console-side and opposite-side 1.25 in long rim rails flush onto the top flanges of the four upper outer sleeves.

  6. Bolt in the end rim rails

    Bolt the infeed and discharge 1.25 in end rim rails flush between the long rails with corner L-brackets.

  7. Bolt in the equipment bearers

    Bolt the infeed, middle weighing, and discharge gate bearers flush across the long rails via the welded mounting tabs.

  8. Mount the fixed-end pedestal

    Bolt the machined aluminum fixed-end pedestal centrally atop the middle weighing bearer.

  9. Mount the cantilever load cell

    Bolt the fixed end of the cantilever strain-gauge load cell to the pedestal so the beam extends horizontally toward the discharge gate and clears the frame.

  10. Bolt on the live-end saddle

    Bolt the angled U-channel live-end saddle to the unsupported live tip of the load cell.

  11. Install the live weighing track at 4°

    Fasten the stainless V-grooved live weighing track solely to the saddle at a 4° downward slope. Leave a 2 mm air gap from the infeed runway and a 2 mm air gap from the reject trapdoor.

  12. Install the funnel support posts and ring

    Bolt two vertical support posts to the outboard ends of the infeed bearer and join them at the top with the circular funnel support ring.

  13. Fit the infeed runway and supports

    Bolt two short runway supports inboard on the infeed bearer and fasten the sloped stainless discharge runway, leaving a 2 mm gap before the weighing track.

  14. Seat the hopper and clamp the spout

    Seat the conical stainless gravity hopper in the support ring and secure its lower spout inside the bolted spout clamp band over the runway.

  15. Install the metering flap with 2 mm clearance

    Bolt the flexible rubber metering flap to the downstream face of the spout clamp band with a 2 mm coin clearance gap to feed pennies single file and slow entry.

  16. Mount the inverted gate brackets

    Bolt the two inverted T-brackets, one on the servo side and one on the opposite side, to the gate bearer clear of the live weighing track.

  17. Mount the gate cheeks and align the spindle holes

    Bolt the two vertical gate cheeks to the brackets, aligning the spindle holes.

  18. Fit the closed trapdoor and retain the spindle

    Position the hinged orange reject trapdoor closed between the cheeks. Slide the stainless pivot spindle through both cheeks and secure it with retaining E-clips.

  19. Mount and couple the rotary servo

    Bolt the L-shaped standoff bracket to the servo-side cheek. Mount the rotary servo and couple its shaft to the trapdoor spindle.

  20. Mount the short reject chute

    Mount the shortened 1.5 in rectangular stainless drop chute beneath the gate frame rim, below the trapdoor.

  21. Position the reject catch pail

    Place the cylindrical reject catch pail directly below the chute on the floor with full slide-out clearance.

  22. Mount the outlet saddles and clamp ferrules

    Bolt the gate-side and downstream outlet tube saddles to the discharge end rail and mount the two rectangular ferrules with top clamp screws.

  23. Align and clamp the accepted-coin outlet tube

    Slide the clear rigid accepted-coin outlet tube through both ferrules, align the tube with the closed trapdoor, and tighten the ferrule clamp screws.

  24. Mount the console and route the cables

    Bolt the console bracket to the console-side long rim rail. Secure the digital OLED weight indicator enclosure facing outward, and route the load-cell, servo, and 12 V DC barrel splitter cables through the frame strain-relief clips.

Related products