TwinWorks
2U Cube Satellite – 3D model preview

2U Cube Satellite

Roge Abrahim · 3D model · Updated 22 Oct 2026

Open in 3D

  • Procedures1shared publicly
  • Views3all time
  • Rating–No ratings yet
  • Likes0from the Community

1 comment

Procedures

Disassembly

Disassembly · 23 steps · No ratings yet

23 steps
  1. Preliminary Preparation

    Make sure all Antenna Hinges are stowed and closed tightly.
  2. Unscrew all Solar Panels Mounting Screws

    Use a hex driver to unscrew all M3 Solar Panel Mounting Screws from the side faces.
  3. Remove the Corner/ Solar Panel Clips

    Remove the Corner Clips that secure the panel edges to the rails.
  4. Lift off all the Solar Panels to Start Disconnecting from the EPS.

    Pull the panels about 1–2 cm away from the frame. Be careful because the Solar Panels are connected via wiring on the inside that will be disconnected in the following steps. 
  5. Add the Remove Before Flight Pin to break all Electrical Connections

    Add the RBF Pin into the EPS board to kill battery power, and break all circuit connections. 
  6. Remove Solar Panels

    After adding the RBF pin, reach in with non-magnetic tweezers to unplug the wires from the 1–6 ports on the EPS board. Lift off each solar panel slowly at one time, and gently set aside facing upwards to protect panels.
  7. Lift off the Aperature Base Plate

    Unscrew the four corner fasteners securing the Aperture Base Plate. Lift the plate straight up the threaded rods, with all its connected components.
  8. Remove Chassis Frame

    Slide the Chassis Frame vertically off the four main threaded rods. This exposes the internal electronics stack for servicing.
  9. Unscrew the Four M3 Threaded Support Rods

  10. Unscrew all Nuts and Hex Screws that clamp the two Adaptor Plates

    Start by unscrewing the nuts on the bottom of the bottom Adaptor Plate, then proceed by removing all four hex screws, on top, clamping the adapter plates.
  11. Remove Both Adapter Plates

  12. Unscrew the Top Positioning Nuts for the Magnetorquer, then Remove all four Threaded Rods.

  13. Lift off the Magnetorquer

    First unplug any connected pins. Use both hands as this is heaviest individual component in the stack. Set aside carefully and gently. 
  14. Unscrew Spacers

    Unscrew in the opposite direction of the threaded rods. Remove the spacers one at a time. 
  15. Remove or Slide the remaining boards (OBC and UHF) in order.

    Before extracting these boards, remove any pin connections and make sure no components are connected via wiring. Start by removing the OBC Board and any spacers if available, then the UHF board.
  16. Unscew the two M3 screws on the top, and the two M2 screws on the side and lift off the EPS Battery Cover.

    Unscrew the M3 screws mounting the EPS Battery Board. The proceed by lifting of the top cover, then the Main Board, then the bottom cover. 
  17. Lift the ESP Power Control Board off with all its components.

  18. Lift the EPS Battery Bottom Cover and unscrew the EPS PCB Positioning Nuts.

  19. Unscrew the Nuts at the bottom holding the four threaded pillar rods, them remove the four rods.

  20. Unscrew Final Set of Nuts, and remove First Adapter Plate.

    Unscrew the 8 Nuts threaded on the final set of pillar rods. Then slowly lift off the First Adapter Plate
  21. Unscrew Final Base of Threaded Rods, and Unscrew the four M2 screws in the Plate Corners

  22. Lift off the Custom Base Plate and Remove Base Clips and Corners

    After unscrewing the M2 screws, remove the Base Corners, and lift off the Custom Base Plate. Finally remove the last set of solar panel clips. 
  23. Disassembly of 2U Cube Satellite Completed Successfully!

Related products