Disassembly
23 steps
Preliminary Preparation
Make sure all Antenna Hinges are stowed and closed tightly.Unscrew all Solar Panels Mounting Screws
Use a hex driver to unscrew all M3 Solar Panel Mounting Screws from the side faces.Remove the Corner/ Solar Panel Clips
Remove the Corner Clips that secure the panel edges to the rails.Lift off all the Solar Panels to Start Disconnecting from the EPS.
Pull the panels about 1–2 cm away from the frame. Be careful because the Solar Panels are connected via wiring on the inside that will be disconnected in the following steps.Add the Remove Before Flight Pin to break all Electrical Connections
Add the RBF Pin into the EPS board to kill battery power, and break all circuit connections.Remove Solar Panels
After adding the RBF pin, reach in with non-magnetic tweezers to unplug the wires from the 1–6 ports on the EPS board. Lift off each solar panel slowly at one time, and gently set aside facing upwards to protect panels.Lift off the Aperature Base Plate
Unscrew the four corner fasteners securing the Aperture Base Plate. Lift the plate straight up the threaded rods, with all its connected components.Remove Chassis Frame
Slide the Chassis Frame vertically off the four main threaded rods. This exposes the internal electronics stack for servicing.Unscrew the Four M3 Threaded Support Rods
Unscrew all Nuts and Hex Screws that clamp the two Adaptor Plates
Start by unscrewing the nuts on the bottom of the bottom Adaptor Plate, then proceed by removing all four hex screws, on top, clamping the adapter plates.Remove Both Adapter Plates
Unscrew the Top Positioning Nuts for the Magnetorquer, then Remove all four Threaded Rods.
Lift off the Magnetorquer
First unplug any connected pins. Use both hands as this is heaviest individual component in the stack. Set aside carefully and gently.Unscrew Spacers
Unscrew in the opposite direction of the threaded rods. Remove the spacers one at a time.Remove or Slide the remaining boards (OBC and UHF) in order.
Before extracting these boards, remove any pin connections and make sure no components are connected via wiring. Start by removing the OBC Board and any spacers if available, then the UHF board.Unscew the two M3 screws on the top, and the two M2 screws on the side and lift off the EPS Battery Cover.
Unscrew the M3 screws mounting the EPS Battery Board. The proceed by lifting of the top cover, then the Main Board, then the bottom cover.Lift the ESP Power Control Board off with all its components.
Lift the EPS Battery Bottom Cover and unscrew the EPS PCB Positioning Nuts.
Unscrew the Nuts at the bottom holding the four threaded pillar rods, them remove the four rods.
Unscrew Final Set of Nuts, and remove First Adapter Plate.
Unscrew the 8 Nuts threaded on the final set of pillar rods. Then slowly lift off the First Adapter PlateUnscrew Final Base of Threaded Rods, and Unscrew the four M2 screws in the Plate Corners
Lift off the Custom Base Plate and Remove Base Clips and Corners
After unscrewing the M2 screws, remove the Base Corners, and lift off the Custom Base Plate. Finally remove the last set of solar panel clips.Disassembly of 2U Cube Satellite Completed Successfully!