Procedures

Assemble Press machine final build

Assembly · 7 steps · No ratings yet

Warning: Isolate all energy, release stored pressure, and secure the platen before assembly

Warning: Fault masking: verify the requested series arrangement before wiring or energizing

Warning: Do not energize before qualified electrical and safeguarding validation

7 steps
  1. Seat the riser and assemble the guided die set

    Preassembly safety. Apply the site lockout/tagout procedure to all energy sources. Release stored hydraulic and pneumatic pressure by the approved methods, verify zero energy, and secure the upper platen against gravity and unexpected movement with the approved mechanical support. Keep isolation in place throughout assembly. Support the platen with the approved handling method during placement and keep clear of pinch points. Use approved drawings and manufacturer instructions for mounting, fasteners, and tightening requirements throughout this procedure.

    1. Seat the 10" x 10" x 4" stainless riser block on the lower bolster bed. Check that it sits flat without rocking.
    2. Seat the two vertical guide rods in the 15" x 8" x 1.5" lower die plate as shown in the approved die-set drawing. Place the lower die plate with both rods onto the riser. Verify that the plate sits flat and that the rods are seated and aligned.
    3. With the upper platen supported, align its guide bushings with both rods and slide the platen onto the rods. Check that both guides engage without binding during supported placement. Do not force the fit or cycle the press. Keep the platen mechanically secured.
  2. Assemble the front-left and front-right step-clamps

    1. At the front-left corner of the lower die plate, seat the left T-stud in its T-slot shoe. Position the left 0104 triangular step block, engage the left serrated clamp bar with the block, and start the left hex nut by hand.
    2. At the front-right corner, seat the right T-stud in its T-slot shoe. Position the right 0104 triangular step block, engage the right serrated clamp bar with the block, and start the right hex nut by hand.
    3. Check that both T-studs are captured, the serrations mesh fully, and the clamp bars bear on the plate at the locations shown in the approved drawing. Tighten both nuts per the approved instructions and recheck that the lower die plate remains seated.
  3. Center and mount the die nest plate

    1. Place the 0.06" (16-gauge) cold-rolled steel die nest plate on the lower die plate. Orient the 0.78" U-pocket toward the infeed and center it between the two vertical guide rods.
    2. Secure the nest plate per the approved drawing. Recheck that it lies flat and that the U-pocket remains centered.
  4. Set the infeed gap and mount the buffer gate

    1. Align the 0.85" aluminum infeed channel with the die pocket. Set an exact 0.125" air gap from the end of the channel to the pocket entry. Secure the channel per the approved drawing and recheck both the alignment and the gap.
    2. Mount the whole 24V buffer gate solenoid directly above the track, upstream of the gap. With power isolated, verify its position over the track and check clearances against the approved drawing.
  5. Install the fiber probes, air hardware, and rear chute

    1. Install the left 2 mm thru-beam fiber-optic transmitter probe, then the right 2 mm receiver probe. Set each probe face 0.008" below the die face. Verify both recesses and that the probes face one another across the pocket.
    2. Mount the whole 1/4" brass air solenoid valve on the left frame. Keep the air supply isolated.
    3. Fit the 1/4" bent copper air nozzle and aim it at the front-left corner of the die pocket. Check aim and clearance without applying air.
    4. Attach the rear ejection chute per the approved drawing. Check that the chute is secure and aligned with the ejection path.
  6. Install the stroke switch, guards, and magnetic interlocks

    1. Fit the proximity switch bracket beside the upper platen. Mount the M18 PNP short-stroke proximity switch and position it for a 0.60" stroke per the approved drawing and device instructions. Check its alignment and clearance with the platen secured. Defer powered confirmation of the switching point to qualified validation.
    2. Fit the front guard carrier and bolt on the front 1/4" clear Lexan safety guard. Fit the rear guard carrier and bolt on the rear 1/4" clear Lexan safety guard. Check that both guards seat securely and meet the clearances on the approved safeguarding drawing.
    3. Mount the front 24V magnetic safety interlock sensor body and front magnet actuator, then mount the rear 24V magnetic safety interlock sensor body and rear magnet actuator. Check each pair for alignment and spacing in the closed-guard position per the device instructions.

    Safety circuit restriction: The requested series arrangement is not approved by this procedure. Before wiring or energizing, qualified personnel must verify it against the approved safety circuit and the device manufacturers’ instructions and assess fault masking: operation of one guard can hide a fault at the other. Do not use the standard CLICK PLC as a safety controller.

  7. Mount the left-side controls and stop for validation

    1. Mount the whole 240V 5HP VFD inside the 12" x 22" left-side bay above the Eaton disconnect switch. Check the mounting position and manufacturer-required clearances.
    2. Mount the body of the 12" x 10" x 6" NEMA 12 PLC enclosure in the same bay above the disconnect, at the position shown on the approved layout. Check fit, door clearance, and continued access to the disconnect.
    3. Fit and secure the 35 mm DIN rail inside the enclosure per the approved layout.
    4. Mount the whole Mean Well MDR-60-24 24V power supply on the rail, then mount the whole AutomationDirect CLICK PLC C0-00DR-D. Check that both devices latch to the rail and meet the manufacturer's mounting and clearance requirements.
    5. Fit the enclosure door if supplied separately. Check that it closes and latches without interference.

    Hold point: do not energize. Keep electrical, hydraulic, and pneumatic energy isolated. Qualified electrical and safeguarding personnel must validate the installation against the approved drawings, safety circuit, and device instructions, including both guard interlocks, fault masking, and the stroke switch setting, before authorizing any energization. Any powered validation must be conducted separately under an approved commissioning plan following that authorization. Do not release the press for operation until qualified personnel complete and document the required functional checks.

Related products

  • MOLDE TFM 2026-v2final

    Irene

    3D model · 1 procedure

    No ratings yet

    0 likes · 0 comments · 1 view

  • X-Wing_Card_Kit

    Mostafa

    3D Printing · 3D model · 1 procedure

    No ratings yet

    1 like · 1 comment · 8 views

  • SO-101 robot arm

    Téa

    Robotics · 3D model · 8 procedures

    No ratings yet

    1 like · 0 comments · 271 views

  • QAV250 Drone V2.3

    Roge Abrahim

    3D model · 2 procedures

    No ratings yet

    0 likes · 0 comments · 10 views

  • Stage 1 Penny Sorter

    Elizabeth